Cedar Ridge Neighborhood
TA Cedar Ridge Neighborhood
The project shall construct on and off road facilities for pedestrians and cyclists along 19th St. between Lake Shore Dr. and Park Lake. 12 ft. wide concrete SUP (2,564 ft.) would be constructed on the north side of 19th St. from Powell Dr. to Park Lake. At Park Lake, cyclists diverge onto 19th Street as a signed bike route identified in the City’s Comprehensive Master Plan. Additional pedestrian facilities would be constructed on the south side of 19th Street between Gregory Lane and Park Lake (3,015 ft.).
(Visited 222 times, 1 visits today)